Lakewood bathroom remodeling project 2

at

7050 W. Cedar Ave.

Lakewood, Co. 

80226

Presented to Taylor & Randy Brenner – 01/29/2018

– Existing bathroom job scope –

– To remove existing bathroom sink, mirror, base and tiles –

– To remove existing toilet, shower pan and shower surround – 

– To remove any damaged wall framing as needed – 

– To remove all the damaged drywall, tiles and underlayment –

– To remove and replace existing bathroom ceiling fan – 

– To remove existing wall separating bathroom and hallway, thus, combining the two areas –

– To remove and relocate existing closet door as needed – 

– Job breakdown –

DECONSTRUCTION:

Demolition – Hauling

  • To demo and remove all damaged/moldy wallboard and 2″ x 4″ wall framing and haul away from job site.
  • To demo and remove all damaged/moldy flooring materials and haul away from job site.
  • To demo and remove the damaged/moldy sink base, faucet, drain and counter top and haul away from job site.
  • To demo and remove the damaged/moldy door and wood trim and haul away from job site.
  • To demo and remove the damaged/moldy floor tile and underlayment and haul away from job site.
  • To demo and remove all damaged/moldy and rusted ceiling fan and venting and haul away from job site.

Mold Mitigation

  • To mitigate mold with a mold mitigation fogger. The Concrobium fogger is an ideal way to apply Concrobium Mold Control, a proven mold fighting solution that effectively eliminates, cleans and prevents mold and musty odors without any harmful chemicals. The fogger atomizes Concrobium Mold Control into a fine mist that quickly and evenly coats surfaces to eliminate existing mold and prevent mold growth.
  • We used Concrobium Mold Control, it is a patented solution that effectively eliminates and prevents mold and mildew without bleach or harmful chemicals. It can also be used to get rid of musty odors.
  • The product works as it dries by crushing mold spores at the roots and leaves behind an invisible antimicrobial shield that prevents future mold growth.
  • Use Concrobium Mold Control for mold and mildew clean-up and prevention, general interior maintenance, water damage restoration and during construction/renovation (paint prep and pre-treatment of building materials).
  • It works great on hard and fabric surfaces such as drywall, wood, composite wood, plastic, concrete, siding, shingles, metal, brick, stone, tile, grout, stucco, fabric (sports bags, clothing), furniture, upholstery, flooring, rubber (front load washing machine gasket) and more.
  • Eliminates, cleans and prevents mold and musty odors
  • Contains no bleach, ammonia or volatile organic compounds (VOCs)
  • Penetrates to the roots of mold and leaves an antimicrobial shield
  • EPA-registered
  • Works on drywall, concrete, wood, masonry, siding, shingles, stone, grout, plastic, tile and many more surfaces.
  • After mitigation was complete we covered the area with a protective paint surface prior to drywall.

CARPENTRY:

– To re-install bathroom 24″ base cabinet –

– To install bathroom 24″ vanity cabinet –

– To install new toilet with wax ring –

– To install a tileable shower pan –

– To remove and relocate door for the bedroom and bathroom –

FLOOR & WALL TILES:

– To install underlayment and floor leveler –

– To install ceramic floor tiles –

– To install ceramic wall tiles –

– Tile material budget approximately $850 –

PAINTING:

– To paint the new drywall with Behr interior bathroom paint –

Home Depot Behr Paint colors

PLUMBING:

– To install a new sink faucet –

– To install a new shower door as needed –

– To install new multi-shower head faucet –

– To relocate existing toilet and sink lines –

– Install new drain lines as needed –

———————————————————————————–

 Total project cost breakdown:

$12,750 for bathroom

(Not including possible damaged floor framing if needed – possible additional 325-400)

– Payment schedule as follows for bathroom –

– $3200 to be paid in advance for materials – PAID

– $2800 to be paid for after demolition and trash haul away – PAID

– $3500 to be paid after rough plumbing of toilet and sink complete – PAID

– $2000 to be paid after floor and shower wall tiles complete –

– $1250 Balance to be paid after completion of painting –

All checks made payable to

Emoh-Home Designers Inc.

——————————————————————————–

*24 month guarantee on all work performed

——————————————————————————–

Job Timeline

Projected timeframe – 14 days total per bathroom

————————————————————————–

(*Not including possible damaged floor framing)