Powder Room tile project

By EMOH2016 / On / In Powder Room

Emoh-Home Designers Inc.

1477 Ivanhoe St.

Denver, Co. 80220

720-232-6096

Emohhomedesigners@icloud.com

Bathroom Remodel – Powder Room

Option A – $2,450

Job Scope:

Demolition – Hauling

– To remove existing tiles and underlayment in Powder room and haul away all debris –

– To remove any damaged existing sub-flooring and haul away all debris –

– To remove and reuse existing toilet – install new wax rings and toilet bolts –

– To remove existing wood baseboard trim and reuse as possible –

MOLD MITIGATION: (if needed)

  • To mitigate mold with a mold mitigation fogger. The Concrobium fogger is an ideal way to apply Concrobium Mold Control, a proven mold fighting solution that effectively eliminates, cleans and prevents mold and musty odors without any harmful chemicals. The fogger atomizes Concrobium Mold Control into a fine mist that quickly and evenly coats surfaces to eliminate existing mold and prevent mold growth.
  • We used Concrobium Mold Control, it is a patented solution that effectively eliminates and prevents mold and mildew without bleach or harmful chemicals. It can also be used to get rid of musty odors.
  • The product works as it dries by crushing mold spores at the roots and leaves behind an invisible antimicrobial shield that prevents future mold growth.
  • Use Concrobium Mold Control for mold and mildew clean-up and prevention, general interior maintenance, water damage restoration and during construction/renovation (paint prep and pre-treatment of building materials).
  • It works great on hard and fabric surfaces such as drywall, wood, composite wood, plastic, concrete, siding, shingles, metal, brick, stone, tile, grout, stucco, fabric (sports bags, clothing), furniture, upholstery, flooring, rubber (front load washing machine gasket) and more.
  • Eliminates, cleans and prevents mold and musty odors
  • Contains no bleach, ammonia or volatile organic compounds (VOCs)
  • Penetrates to the roots of mold and leaves an antimicrobial shield
  • EPA-registered
  • Works on drywall, concrete, wood, masonry, siding, shingles, stone, grout, plastic, tile and many more surfaces.
  • After mitigation was complete we covered the area with a protective paint surface prior to drywall.

CARPENTRY

– To install new James Hardie
HardieBacker 3 ft. x 5 ft. x 1/4 in. Cement Backerboard over existing sub-flooring –

– To install Hardi-backer board to existing sub-flooring with Backer-On
#10 x 1-1/4 in. Zinc-Plated Steel Flat-Head Square Cement Board Screws  –

– To install underlayment backer board with Custom Building Products
ProLite 30 lb. Gray Tile and Stone Mortar –

FLOOR TILES, GROUT & SEALER

– To install underlayment and floor leveler as needed –

– To install approximately 45′ of floor tile, client provides –

– To install Daltile grout, client provides –

– To install a grout sealer, client provides –

 

PLUMBING

– To install and reuse existing toilet –

– To install new wax rings and shut off valves as needed –

– To install and reuse the existing Pedestal sink  –

– Payment schedule as follows –

– $1250 to be paid after demolition and Hardi-backer sub-floor installation  –

– $850 to be paid after floor tile installation  –

– $balance to be paid after completion –

————————————————————————–

——————————————————————

All checks made payable to

Emoh-Home Designers Inc.

*24 month guarantee on all work performed

Our General Liability Policy information;

 

Highland Neighborhood Renovation Project

By EMOH2016 / On / In Highland Neighborhood Renovation

Emoh-Home Designers Inc.

1477 Ivanhoe St.

Denver, Co. 80220

720-232-6096

Emohhomedesigners@icloud.com

Highland Neighborhood Renovation Project

2519 W 32nd Ave,
Denver, CO 80211
3 beds 2 baths 1,974 sqft

– To refinish existing wood floors throughout home and stain to client specs. –

– To refinish existing wood floors throughout home and stain to match existing master bedroom –

– To remove existing vanity, toilet and tub in existing bathroom and remove to studs and sub-floor as needed –

– To remove existing floor and wall tiles in existing bathroom and remove to studs and sub-floor as needed –

– To cure & remove all possible mold by mold mitigation –

– To remove existing kitchen wall cabinets –

– To remove existing kitchen wall to create an “open frame” & haul away all debris properly –

– To add a bathroom in the basement and finish to client specs. – (phase two)

– To add/frame out a bedroom, bathroom and family in the basement and finish to client specs. – (phase two)

– To install one Egress window in basement bedroom – (phase two)

– To add a mud room with counter space in the basement and finish to client specs. – (phase two)

– To remove damaged trees in backyard – (phase three)

– To remove damaged/destroyed Arbor in backyard and haul away – (phase three)

– To remove two windows to install a Sliding Patio Door or French door –

– To install a new 60 in. x 80 in. Sliding Patio Door or French door (client supplies) –

Several options;

Home Depot Patio Doors

– MP Doors $1049
60 in. x 80 in. Smooth White Right-Hand Composite DP50 Sliding Patio Door with Built in Blinds –

– Stanley Doors $560
59 in. x 80 in. Glacier White Vinyl Left-Hand Low-E Sliding Patio Door with Screen –

 

– To install a new deck approximately 10′ x 10′ in the back off kitchen with a TREX COMPOSITE DECKING (client supplies) –

–  Trex

Enhance 1 in. x 6 in. x 12 ft. Beach Dune Grooved Edge Capped Composite Decking Board

About TREX

Enhance composite decking offers all of the charm and none of the trouble of real wood. Thanks to high-performance technology, Enhance decking retains its beauty for years with only minimal upkeep. And when it comes to deck design, our Decking & Railing Duos can give you an idea of what’s possible. Plus, you can feel good about your purchase, since Trex is made from 95% recycled materials.

California residents: see   Proposition 65 information 

  • Composite material that won’t warp, rot, split or splinter
  • High-performance protective shell resists fading, staining, scratching and mold
  • Cleans easily with soap and water
  • Features high-definition grain pattern and a wide range of colors
  • Use grooved-edge boards and Trex Hidden Fasteners for a screw-free surface or square-edge boards for traditional decking applications, edging and stairs
  • Backed by the Trex 25-Year Limited Residential Warranty and the Trex 25-Year Limited Residential Fade & Stain Warranty

– To install one Amerimax Home Products
48 in. x 36 in. x 42 in. Galvanized Egress Window Well – client provides –

– To install Amerimax Home Products
Egress Area Wall Escape Ladder – client provides –

 

 

 

 

– New master bathroom design concepts –

– New hallway bathroom design concept –

– Job scope –

– To add/relocate existing second floor bathroom to accommodate for additional bathroom with separate entrance – (phase one)

– To refinish existing wood floors throughout home and stain to match existing master bedroom – (phase one)

– To paint the home walls and trim with Behr interior paint to client specs. – (phase one)

– To remove existing kitchen wall to create an “open frame” & haul away all debris properly – (phase one)

– To install a new 60 in. x 80 in. Sliding Patio Door or French door – (phase one)

– To add a bathroom in the basement and finish to client specs. – (phase two)

– To install one 48 in. x 36 in. x 42 in. Galvanized Egress Window Well – (phase two)

– To add/frame out a bathroom and bedroom/family room in the basement and finish to client specs. – (phase two)

– To install a new deck approximately 10′ x 10′ off kitchen with a TREX COMPOSITE DECKING – (phase three)

– To remove existing damaged trees in backyard & haul away all debris properly – (phase three)

– To install a new concrete pad approximately 20′ x 20′ – (phase three)

– To install a new covered carport approximately 18′ x 20′ – (phase three)

– To install a new electric sliding gate opening to the alley – (phase three)

– Job breakdown –

DECONSTRUCTION: Phase One

(proper procedure and disposal for all lead based paint and asbestos removal as required will be adhered)

Demolition – Hauling – Disposal

– To remove all tile and fixtures as needed in existing second floor bathroom and haul away all debris properly –

– To remove existing master bath wall to create additional second floor bathroom & haul away all debris properly –

– To remove existing kitchen wall to create an “open frame” look to specs. & haul away all debris properly –

– To remove existing kitchen wall cabinets above stove and repurpose for basement mudroom –

– To remove any damaged existing sub-flooring (as needed) in bathroom and haul away all debris properly –

– To remove and reuse existing toilet if possible as needed – install new wax rings and toilet bolts –

– To remove existing baseboard and door trim and reuse as needed if possible –

– To cure & remove all possible mold by mold mitigation –

Mold Mitigation (if needed)

  • To mitigate mold with a mold mitigation fogger. The Concrobium fogger is an ideal way to apply Concrobium Mold Control, a proven mold fighting solution that effectively eliminates, cleans and prevents mold and musty odors without any harmful chemicals. The fogger atomizes Concrobium Mold Control into a fine mist that quickly and evenly coats surfaces to eliminate existing mold and prevent mold growth.
  • We used Concrobium Mold Control, it is a patented solution that effectively eliminates and prevents mold and mildew without bleach or harmful chemicals. It can also be used to get rid of musty odors.
  • The product works as it dries by crushing mold spores at the roots and leaves behind an invisible antimicrobial shield that prevents future mold growth.
  • Use Concrobium Mold Control for mold and mildew clean-up and prevention, general interior maintenance, water damage restoration and during construction/renovation (paint prep and pre-treatment of building materials).
  • It works great on hard and fabric surfaces such as drywall, wood, composite wood, plastic, concrete, siding, shingles, metal, brick, stone, tile, grout, stucco, fabric (sports bags, clothing), furniture, upholstery, flooring, rubber (front load washing machine gasket) and more.
  • Eliminates, cleans and prevents mold and musty odors
  • Contains no bleach, ammonia or volatile organic compounds (VOCs)
  • Penetrates to the roots of mold and leaves an antimicrobial shield
  • EPA-registered
  • Works on drywall, concrete, wood, masonry, siding, shingles, stone, grout, plastic, tile and many more surfaces.
  • After mitigation was complete we covered the area with a protective paint surface prior to drywall.

CARPENTRY:

– To relocate existing bathroom door per specs –

– To remove/relocate and add walls to create additional bathroom per specs –

– To add a new closet in M.B and frame, drywall/plaster to finish –

– To install new doors for closet – (client supplies)

 – To install new 1/2″ Hardi-backer wall board in the showers –

– To install 1/4″ Hardi-backer board for floor tile as needed –

– To install two a 24″ & 48″ bathroom vanities and countertops (client supplies) –

Local sources for tile and cabinetry

Stone International Cabinets

Home Depot vanities

– To install one Amerimax Home Products
48 in. x 36 in. x 42 in. Galvanized Egress Window Well (client supplies) –

– To install Amerimax Home Products
Egress Area Wall Escape Ladder (client supplies) –

– To repurpose existing bathroom fixtures as possible for basement bathroom –

– To repurpose existing kitchen window being removed for patio door and replace existing back door –

ELECTRICAL: by licensed Electrician 

– To install new gfci outlets  –

– To install new vanity lights and can lighting to specs. – (client provides)

– To install two new ceiling fans in each bathroom – (client provides)

Home Depot Lights

(not including any potential plumbing or electrical upgrades needed by city)

FLOOR & WALL TILES:

– To install new James Hardie
HardieBacker 3 ft. x 5 ft. x 1/4 in. Cement Backerboard over existing sub-flooring – and floor leveler as needed –

– To install Hardi-backer board to existing sub-flooring with Backer-On
#10 x 1-1/4 in. Zinc-Plated Steel Flat-Head Square Cement Board Screws  –

– To install underlayment backer board with Premium Custom Building Products
ProLite 30 lb. Gray Tile and Stone Mortar –

– To install Custom floor leveler as needed –

– To install approximately 100′ of wall tiles around tub/shower – (client provides)

– To install approximately 70′ floor tile in master bathroom – (client provides)

– To install approximately 25′ of floor tile in new hall bathroom – (client provides)

PAINTING:

BEHR by Home Depot

Done right and on time…

Our team of Trusted professionals get it right the first time…

– To paint with Behr or Benjamin Moore interior bathroom paint to specs.(client supplies) –

Home Depot Behr Paint colors

Benjamin Moore Paint colors

PLUMBING: To code by licensed Plumber

(not including any issues with drain line from basement to city line)

– To relocate existing sink, shower and toilet drain lines according to specs –

– To relocate and install new sink, shower and toilet water supply lines according to specs –

– To install a new vanity and shower sink faucets as needed – (client provides)

– To install a new drains and vents as needed –

– To install new 1/4′ turn shut-off valves –

– To install new vanities and countertops – (client provides)

– To install new 60″ tub/shower door – (client provides)

– To install new Home Depot American Standard (client provides)
Champion 4 Max Tall Height 2-Piece High-Efficiency 1.28 GPF Single Flush Elongated Toilet in White with Slow Close Seat –

– To install new American Standard
EverClean 60 in. x 32 in. Reversible Drain Whirlpool Tub in White for M.B. (client supplies) –

– To install new American Standard
5 ft. Left Drain Soaking Bathtub in White for hallway bathroom (client supplies) –

 

Local Sources

Paint colors and options

Home Depot Behr Paint colors

Benjamin Moore Paint colors

Local sources for tile and cabinetry

Stone International Cabinets

Home Depot vanities

Home Depot Tile selections

Floor & Decor Subway tiles

– Subway tile & Mosaic tile examples from our portfolio –

 Total project cost breakdown: Includes all design services!

Option A.  73,850 with kitchen wall frame out and trim to finish

Option B.  69,350 without kitchen frame out

Expected Client Costs;

(Client pays finish material expenses and Emoh-Home Designers Inc. will supply all labor and raw materials)

 two bath/shower doors – approx. $250-550

 One 48″ double bowl vanity & top for master bath price range from $450-850

 One 24″ single bowl vanity & top for hall bathroom price range from $250-550

– Approximately 100′ of wall tiles around tub/shower – price range from $350-950

– Approximately 70′ floor tile in master bathroom – price range from $350-750

– Approximately 25′ of floor tile in new hall bathroom – price range from $100-250

– Approximately 90′ of wall tile in new hall bathroom – price range from $150-360

– New vanity and shower sink faucets as needed – price range from $350-600

– Two American Standard Champion 4 Max Tall Height 2-Piece High-Efficiency 1.28 GPF Single Flush Elongated Toilets in White with Slow Close Seats – ($178.00 each x two = $356 + tax/delv.)

– One American Standard
EverClean 60 in. x 32 in. Reversible Drain Whirlpool Tub in White
 for M.B. – ($695 each + tax/delv.)

– One American Standard
American Standard Deep Soak Drain for M.B. – ($74 each + tax/delv.)

Optional, One American Standard
8 in. x 5 in. Safe-T Heater
 for M.B. – ($172 each + tax/delv.)

– One American Standard
5 ft. Left Drain Soaking Bathtub in White for hallway bathroom – ($291 each + tax/delv.)

– One American Standard
Heritage 1.24 in. Grid Drain in Brushed Nickel
 for hallway bathroom – ($24 each + tax/delv.)

–  One Stanley Door
59 in. x 80 in. Glacier White Vinyl Left-Hand Low-E Sliding Patio Door with Screen – ($560 each + tax/delv.)

or

– One MP Door
60 in. x 80 in. Smooth White Right-Hand Composite DP50 Sliding Patio Door with Built in Blinds – ($1049 each + tax/delv.)

– 100′ of deck & framing, approximately 10′ x 10′ off kitchen with a TREX COMPOSITE DECKING – (approx.  $1250 + tax/delv.)

– To install a new covered carport approximately 18′ x 20′ – (approx.  $1650 + tax/delv.)

– Total projected client costs range from $7250 – $9,850 –

(not including any potential plumbing or electrical upgrades needed by city) 

————————————————————————————

– Payment schedule as follows –

Phase 1 second floor bathroom, closet, floors and painting

– $5,000 to be paid upon agreement of the project to secure proper trades required  –

– $tbd to be paid after second floor bathroom demolition and haul away –

– $tbd to be paid after kitchen wall demolition and haul away –

– $tbd to be paid after rough plumbing & electrical installation –

– $tbd to be paid after kitchen frame out is complete –

– $tbd to be paid after second floor wood floor completion –

– $tbd to be paid for second floor bathrooms tile and fixtures –

– $tbd to be paid after second floor bathrooms tile and fixtures installed –

– $tbd to be paid after second floor paint completion –

– $balance to be paid after completion –

Phase 2 – Basement – Mudroom

– $tbd to be paid after basement egress window installation –

– $tbd to be paid after basement rough framing installation –

– $tbd to be paid after basement rough plumbing & electrical installation –

– $tbd to be paid after basement drywall installation –

– $tbd to be paid after basement bedroom completion –

– $tbd to be paid for basement bathroom tile and fixtures – (client provides)

– $tbd to be paid after basement bathroom tile and fixtures installed –

– $tbd to be paid after basement paint completion –

– $balance to be paid after basement completion –

Phase 3 – Exterior

– $tbd to be paid after damaged tree(s) removal –

– $tbd to be paid for concrete pour and completion of pad –

– $tbd to be paid after existing Arbor removal –

– $tbd to be paid for automatic gate and fence materials –

– $tbd to be paid after gate and fence installation complete –

– $tbd to be paid for deck and new back door materials

– $tbd to be paid after new deck and or railing installation is completed –

– $tbd to be paid after new back door installed –

– $tbd to be paid after completion –

————————————————————————–

——————————————————————

All checks made payable to

Emoh-Home Designers Inc.

*24 month guarantee on all work performed

Our General Liability Policy information;

 

2018 HIGHLANDS NEIGHBORHOOD COST VS VALUE RENOVATION REPORT

  • Zillow current estimate = 806,000 = $408 per ft.
  • Redfin current estimate = 794,047 = $402 per ft.
  • Trulia current estimate = 784,019 = $397 per ft.

  • 2519 W 32nd Ave,
    Denver, CO 80211
    3 beds 2 baths 1,974 sq ft = $408 per ft.

  • 2511 W 32nd Ave,
    Denver, CO 80211
    7 beds 2 baths 1,245 sq ft – estimate $1,165,323 =$936 per ft.

  • 2719 W 32nd Ave,
    Denver, CO 80211
    3 beds 3 baths 2,759 sqft – estimate $775,000 =$281 per ft. (currently listed)

  • 2653 W 32nd Ave,
    Denver, CO 80211
    5 beds 6 baths 3,679 sqft – Last sold: Jul 2017 for $1,100,000
    Last sale price/sqft: $299 – current value estimate is $1,386,552 or price/sqft: $376 – this reflects a roughly 26% increase in 12 months.

  • 2611 W 32nd Ave,
    Denver, CO 80211
    3 beds 3 baths 2,800 sqft –  Last sold: Sold on 09/08/15 for $1,000,000
    Last sale price/sqft: $357 – current value estimate is $1,468,762 or price/sqft: $524 – this reflects a roughly 46% increase in 36 months.

  • 2623 W 32nd Ave,
    Denver, CO 80211
    4 beds 2 baths 3,338 sqft – Last sold: Sold on 12/13/17 for $812,500
    Last sale price/sqft: $243 – current value estimate is $842,390 or price/sqft: $252 – this reflects a roughly 3.8% (or almost 8% yearly) increase in 7 months.

Notes:

  • Currently, Denver has an overall growth of 4.2% – 4.8% annually according to current numbers available, meaning if you purchase the home for 800,000 you can expect an increase in value of approximately 32,500-40,000 over the next 12 months.

 

  • The great news is that the current trend in the Highlands neighborhood (specifically within a couple blocks either way of 2519) the values have seen an increase from a MINIMUM of 8% to over 30%+ in some very recent situations.

HomeAdvisor approved Remodeling contractors in Denver – text 720-232-6096

By EMOH2016 / On / In HomeAdvisor approved Remodeling contractors in Denver - text 720-232-6096

HomeAdvisor approved Remodeling contractors in Denver

Text or call now!

720-232-6096

HomeAdvisor
Screened & Approved
This service provider has passed the HomeAdvisor screening process.

HomeAdvisor profile – Emoh-Home Designers Inc.

Text or call now!

720-232-6096

Check out our before and after pictures!

Before and after bathroom pictures with a built-in Hollywood make-up mirror and heated jetted soaking tub with marble tile accents throughout!

This bathroom transformed a 5′ x 7′ bathroom and a 5′ x 9′ closet into one room 5′ x 16′ spa style room!

 – The old ceiling fan didn’t work and was full of rust:( – The new ceiling fan includes a blue night light with blue tooth speakers in the unit!

 

 

– The old tub was lackluster and full of damaged tiles- The new tub is an American Standard
EverClean 5 ft. x 32 in. Left Drain Whirlpool Tub in White with a deep soaking drain.

 

 

– Built in make-up mirrors with vanity table and matching stool:)

 

 

– Marble tile gives the space an elegant feeling throughout.

 

 

– This bathroom has dimmable led lighting and GFCI outlets throughout.

 

HomeAdvisor approved Remodeling contractors in Denver – Aurora – Cherry Creek

text 

720-232-6096

HomeAdvisor approved Remodeling contractors in Denver – Aurora – Cherry Creek

By EMOH2016 / On / In Uncategorized

HomeAdvisor approved Remodeling contractors in Denver – Aurora – Cherry Creek

Text or call now!

720-232-6096

HomeAdvisor
Screened & Approved
This service provider has passed the HomeAdvisor screening process.

HomeAdvisor profile – Emoh-Home Designers Inc.

Text or call now!

720-232-6096

Check out our before and after pictures!

Before and after bathroom pictures with a built-in Hollywood make-up mirror and heated jetted soaking tub with marble tile accents throughout!

This bathroom transformed a 5′ x 7′ bathroom and a 5′ x 9′ closet into one room 5′ x 16′ spa style room!

 – The old ceiling fan didn’t work and was full of rust:( – The new ceiling fan includes a blue night light with blue tooth speakers in the unit!

 

 

– The old tub was lackluster and full of damaged tiles- The new tub is an American Standard
EverClean 5 ft. x 32 in. Left Drain Whirlpool Tub in White with a deep soaking drain.

 

 

– Built in make-up mirrors with vanity table and matching stool:)

 

 

– Marble tile gives the space an elegant feeling throughout.

 

 

– This bathroom has dimmable led lighting and GFCI outlets throughout.

 

HomeAdvisor approved Remodeling contractors in Denver – Aurora – Cherry Creek

text 

720-232-6096

Find reliable Remodeling contractors in Denver – Aurora – Cherry Creek

By EMOH2016 / On / In Find reliable Remodeling contractors in Denver, Find reliable Remodeling contractors in Denver - Aurora - Cherry Creek

Find reliable Remodeling contractors in Denver – Aurora – Cherry Creek

Text or call now!

720-232-6096

HomeAdvisor
Screened & Approved
This service provider has passed the HomeAdvisor screening process.

HomeAdvisor profile – Emoh-Home Designers Inc.

Text or call now!

720-232-6096

Check out our before and after pictures!

Before and after bathroom pictures with a built-in Hollywood make-up mirror and heated jetted soaking tub with marble tile accents throughout!

This bathroom transformed a 5′ x 7′ bathroom and a 5′ x 9′ closet into one room 5′ x 16′ spa style room!

 – The old ceiling fan didn’t work and was full of rust:( – The new ceiling fan includes a blue night light with blue tooth speakers in the unit!

 

 

– The old tub was lackluster and full of damaged tiles- The new tub is an American Standard
EverClean 5 ft. x 32 in. Left Drain Whirlpool Tub in White with a deep soaking drain.

 

 

– Built in make-up mirrors with vanity table and matching stool:)

 

 

– Marble tile gives the space an elegant feeling throughout.

 

 

– This bathroom has dimmable led lighting and GFCI outlets throughout.

 

Find reliable Remodeling contractors in Denver – Aurora – Cherry Creek

text 

720-232-6096

Kitchen/home remodeling project – Example bid

By EMOH2016 / On / In Kitchen Breakdown

Emoh-Home Designers Inc.

1477 Ivanhoe St. Denver, Co. 80220

  kitchen – home remodeling project

presented to

Mr. & Mrs. Example – 02/28/2018

Littleton, Co

phone # 720-000-0000

(see job scope – breakdown – timeline & payment schedule below – Bid expires 03-28-2018)

Objective

Kitchen Remodel – Open Concept

Remove and replace existing flooring

Repaint and refresh interior of home

Replace all electrical outlets/switches interior of home

Timeline – To complete project in March and be available for rent in April

Notes

Install stove vent/hood above the new stove which will be located in the island OR to install a downdraft vent to utilize the space above the stove for a chandelier or pendant.

Install a large island (approx. 3′-6″ x 8′) with 12-14″ overhang for bar stool seating.

Install granite countertops throughout the kitchen.

Install new undermount sink, faucet, garbage disposal, new copper piping  1/4 turn shut-offs.

Proposed Open Design

– Existing job scope –

– Job breakdown –

DECONSTRUCTION: (included with the carpentry bid)

Demolition – Hauling

– To remove existing cabinets and appliances –

– To remove and raise the existing “flat” ceiling in the kitchen –

– To remove existing wall separating kitchen and living room, thus, combining the two areas creating an open concept –

– To remove and relocate existing kitchen pantry/closet into garage creating a recessed 24″ pantry –

– To remove existing kitchen sink and drains –

– To remove all existing kitchen base and wall cabinets –

– To remove existing countertops –

– To remove existing kitchen pantry –

– To demo and remove existing flooring –

CARPENTRY: $28,725

– To install header supports as/if needed for open concept –

– To install header and create a built-in fridge/pantry into the garage –

– To install kitchen base cabinets per specs –

– To install kitchen wall cabinets per specs –

– To install a built-in island approx. 84″ – 90″ length x 36″ – 48″ wide with stove (either downdraft stove or vented hood, client provides) and eating area –

– To install approximately 36′ – 40′ of counter-tops –

– To install new 36″: fridge (client provides all appliances) with ice maker in built-in pantry area located in garage –

–  $2500 countertop material budget allowance for approximately 36′ – 40′ –

ELECTRICAL: $2230

– To install 10-12 new can lights and LED fixtures –

– To replace all outlets and switches with new face plates – White –

– To install dimmer switches on all new switches connected to new can lighting –

– To install in-cabinet and above cabinet lighting in the kitchen –

FLOORING: Wood Grain Tile $6,850

– Material allowance up to 3.00 per ft for wood grain tiles –

– To install underlayment and/or floor leveler as needed –

– To install approximately 750′ of wood grain tiles –

FLOORING: Carpeting & Padding $2,325

– Material allowance up to 3.00 per ft for carpet & pad –

– To install approximately 700′ of pad and carpeting in the bedrooms throughout –

MISC:

– To remove and replace the sliding glass door located in the kitchen – $865 or $1135

Option A. $865 – includes labor and materials for JELD-WEN
60 in. x 80 in. V-2500 Series Sliding Vinyl Patio Door installation – includes removal of existing sliding glass door.

or

upgrade to Low-E,

Option B. $1135 – Labor and Materials for Stanley Door
60 in. x 80 in. Double Sliding Patio Door Clear Low-E installation – includes removal of existing sliding glass door.

– To scrape popcorn ceilings throughout home – finish with a modern skim coat, approximately 700′ – $1650

– To install new stainless steel appliances, i.e. fridge, stove, microwave, dishwasher, sink & cabinet hardware (Client provides) – Emoh-Home Designers Inc. provides all necessary hook ups. (included with the carpentry bid)

– To install new stove with downdraft and/or range hood (client provides all appliances) according to specs – (included with the carpentry bid)

Price comparisons for appliances

BEST BUY Refrigerators

BEST BUY Ranges, Cooktops & Ovens

BEST BUY
Dishwashers

SEARS Appliances

LOWES Appliances

HOME DEPOT Appliances

Local Dealers

APPLIANCE FACTORY

MOUNTAIN HIGH APPLIANCE

PAINTING: $5,650

– To paint all walls with BEHR or Benjamin Moore Paint –

(SW7015 repose grey with a white trim & semi-gloss sheen in bathrooms & kitchen)

– To paint an accent wall (fireplace wall) with BEHR or Benjamin Moore Paint –

– To paint all doors and baseboard trim (white) with BEHR or Benjamin Moore Trim Paint –

CLEAN AND CAULK: (included with painting bid)

– To clean all walls free of dust and debris –

– To repair any minor holes and patch as needed –

– To caulk any major defects and cracks as needed –

TAPE AND PREP: (included with painting bid)

– To fill and caulk boards as needed –

– To tape and prep as needed before Painting –

FIREPLACE MANTEL & BRICK: (included with painting bid)

– To prep and paint to specs –

Home Depot Behr Paint colors

Benjamin Moore Paint colors

PLUMBING: (included with the carpentry bid)

– To install a new single handle sink “TOUCH” technology faucet (Delta, Moen or Price Pfister) –

– To install a new drains as needed –

– To install new  1/4 turn shut-off valves –

– To install new plumbing p-traps and shut-offs –

– To install new Black/white/stainless single bowl sink –

– To install a new InSinkErator 3/4 horsepower garbage disposal and drain –

– To install new sink and dishwasher (client provides dishwasher) with new sink lines according to specs below –

– To install new 36″: fridge (client provides all appliances) with ice maker in built-in pantry area located in garage –

WINDOW SCREENS: (included with the carpentry bid)

FRONT GUTTER REPLACEMENT: (included with the carpentry bid)

Job Timeline

Projected timeframe to complete – approximately 4-5 weeks 

Projected start date within 7 days

First step; Agreeing on project scope and price –

Second step; Scheduling – for  samples for all materials, less than 5 days out after confirmation –

Third step; Scheduling the project –

Next step; Demo to completion –

Next step; Carpentry to completion –

Next step; Rough Electrical & Plumbing to completion –

Next step; flooring to completion –

Next step; Cabinet installation to completion –

Next step; Painting to completion –

Next step; Final walk through with trades to completion –

 Total project cost breakdown:

– Payment schedule as follows for bathroom – TBD after final walk through –

– $ to be paid for after demolition and trash haul away  –

– $ to be paid for materials –

– $ to be paid after kitchen cabinet installation –

– $ to be paid after rough plumbing complete –

– $ to be paid after rough electrical complete –

– $ to be paid after floor tile installation complete –

– $ to be paid after wall painting complete –

– $ to be paid after trim & ceiling painting complete –

– $ Balance to be paid upon completion –

All checks made payable to

Emoh-Home Designers Inc.

*24 month guarantee on all work performed

Our General Liability Policy information;

 

Lakewood kitchen remodeling project

By EMOH2016 / On / In Lakewood kitchen remodeling project

Emoh-Home Designers Inc.

1477 Ivanhoe St. Denver, Co. 80220

Lakewood kitchen remodeling project

7050 W. Cedar Ave. Lakewood, Co.

Presented – 01/31/2018

– Existing kitchen job scope –

– To remove existing kitchen sink and ceramic backsplash tiles –

– To remove all existing kitchen base and wall cabinets – 

– To remove any damaged wall framing as needed – 

– To remove all the damaged drywall and underlayment as needed –

– To remove existing counter tops – 

– To remove existing kitchen pantry –

– To demo and remove existing floor tiles –

– Job breakdown –

DECONSTRUCTION:

Demolition – Hauling

  • To demo and remove all kitchen cabinets and haul away from job site.
  • To demo and remove all kitchen flooring materials and haul away from job site.
  • To demo and remove the damaged/moldy sink base, faucet, drain and counter top and haul away from job site.
  • To demo and remove existing bi-fold door and wood trim and haul away from job site.
  • To demo and remove any damaged/moldy underlayment and haul away from job site.

Mold Mitigation

  • To mitigate mold with a mold mitigation fogger. The Concrobium fogger is an ideal way to apply Concrobium Mold Control, a proven mold fighting solution that effectively eliminates, cleans and prevents mold and musty odors without any harmful chemicals. The fogger atomizes Concrobium Mold Control into a fine mist that quickly and evenly coats surfaces to eliminate existing mold and prevent mold growth.
  • We used Concrobium Mold Control, it is a patented solution that effectively eliminates and prevents mold and mildew without bleach or harmful chemicals. It can also be used to get rid of musty odors.
  • The product works as it dries by crushing mold spores at the roots and leaves behind an invisible antimicrobial shield that prevents future mold growth.
  • Use Concrobium Mold Control for mold and mildew clean-up and prevention, general interior maintenance, water damage restoration and during construction/renovation (paint prep and pre-treatment of building materials).
  • It works great on hard and fabric surfaces such as drywall, wood, composite wood, plastic, concrete, siding, shingles, metal, brick, stone, tile, grout, stucco, fabric (sports bags, clothing), furniture, upholstery, flooring, rubber (front load washing machine gasket) and more.
  • Eliminates, cleans and prevents mold and musty odors
  • Contains no bleach, ammonia or volatile organic compounds (VOCs)
  • Penetrates to the roots of mold and leaves an antimicrobial shield
  • EPA-registered
  • Works on drywall, concrete, wood, masonry, siding, shingles, stone, grout, plastic, tile and many more surfaces.
  • After mitigation was complete we covered the area with a protective paint surface prior to drywall.

CARPENTRY:

– To install kitchen base cabinets per specs –

– To install kitchen wall cabinets per specs –

– To install new lights and fixtures –

– To install new plumbing p-traps and shut-offs –

– To install new 3/4 hp garbage disposal –

– To install bi-fold doors for laundry area –

– To install approximately 48′ of counter-tops –

– To install new 36″: fridge (client provides all appliances) with ice maker in existing pantry area –

–  $ 1250 countertop material budget allowance for island and top and or approximately $27-30 per foot –

FLOOR & WALL TILES:

– To install underlayment and floor leveler as needed –

– To install approximately 195′ of ceramic/glass wall backsplash tiles –

– To install approximately 30′ of ceramic/glass wall backsplash tiles –

–  $750 tile material budget allowance for backsplash and floor tiles or approximately $3.50 per foot –

PAINTING:

– To paint the new drywall with Behr interior bathroom paint –

Home Depot Behr Paint colors

PLUMBING:

– To install a new single handle sink faucet –

– To install a new drains as needed –

– To install new shut-off valves –

– To install new Black double bowl sink –

– To install a new InSinkErator 3/4 horsepower garbage disposal and drain –

– To relocate existing sink and dishwasher and sink lines according to specs below –

———————————————————————————–

 Total project cost breakdown:

$23,500 for bathroom

(Not including upgraded counter-top)

– Payment schedule as follows for bathroom –

– $8800 to be paid in advance for materials – PAID

– $3500 to be paid for after demolition, trash haul away and Mold mitigation – PAID

– $3000 to be paid for countertop installation –

– $2000 to be paid after rough plumbing complete – PAID

– $2000 to be paid after rough electrical complete – PAID

– $2500 to be paid after floor and backsplash tiles complete – PAID

– $1700 Balance to be paid after completion – PAID

All checks made payable to

Emoh-Home Designers Inc.

*24 month guarantee on all work performed

Highlights

New Black Granite Quartz 33″ x 22″ x 9-1/2″ Equal Double Bowl Dual Mount Sink

InSinkErator
Badger 900 3/4 HP Continuous Feed Garbage Disposal

Price Quantity
1
70265501
SEKTION base corner cabinet frame
white
38x38x30 “
1
50266040
BODBYN 2-p door/corner base cabinet set
gray
13×30 “
1
60215291
UTRUSTA corner base cabinet carousel
34 1/2 “
1
00204648
UTRUSTA hinge
153 °
1
2
20265396
SEKTION base cabinet frame
white
18x24x30 “
1
30266041
BODBYN drawer front
gray
18×5 “
1
10266042
BODBYN drawer front
gray
18×10 “
1
90266043
BODBYN drawer front
gray
18×15 “
1
50265682
MAXIMERA drawer, high
white
18×24 “
1
70265657
MAXIMERA drawer, low
white
18×24 “
1
00265665
MAXIMERA drawer, medium
white
18×24 “
1
60288348
OMLOPP LED light strip for drawers
aluminum color
17 “
1
5
80265398
SEKTION base cabinet frame
white
36x24x30 “
1
Double bowl black sink 1
50325426
LILLVIKEN sink strainer with stopper
2
1
80266034
BODBYN door
gray
18×30 “
2
60204645
UTRUSTA hinge
125 °
2
20317852
LILLVIKEN lid
2
60284581
SEKTION reinforced ventilated top rail
galvanized
36 “
1
4
90265388
SEKTION base cabinet frame
white
24x24x30 “
1
70266044
BODBYN drawer front
gray
24×5 “
3
20266046
BODBYN drawer front
gray
24×15 “
1
10265679
MAXIMERA drawer, high
white
24×24 “
1
70265662
MAXIMERA drawer, low
white
24×24 “
3
40288349
OMLOPP LED light strip for drawers
aluminum color
23 “
1
7
10265504
SEKTION corner wall cabinet frame
white
26x26x30 “
1
90266076
BODBYN glass door
gray
15×30 “
1
80265647
UTRUSTA wall corner cabinet carousel
1
40295726
OMLOPP LED countertop light
white
15 “
2
10288341
OMLOPP LED spotlight
aluminum color
2 5/8 “
1
8
80265464
SEKTION wall cabinet frame
white
18×14 3/4×30 “
1
80266034
BODBYN door
gray
18×30 “
1
80265529
UTRUSTA shelf
white
18×14 3/4 “
1
60204645
UTRUSTA hinge
125 °
1
20295727
OMLOPP LED countertop light
white
18 “
1
9
20265462
SEKTION wall cabinet frame
white
30×14 3/4×15 “
1
40266069
BODBYN drawer front
gray
30×15 “
1
90265736
UTRUSTA small hinge for horizontal door
white
1
40295726
OMLOPP LED countertop light
white
15 “
2
10
70265450
SEKTION wall cabinet frame
white
24×14 3/4×30 “
1
70266039
BODBYN door
gray
24×30 “
1
10265523
UTRUSTA shelf
white
24×14 3/4 “
1
60204645
UTRUSTA hinge
125 °
1
00295728
OMLOPP LED countertop light
white
24 “
1
11
40265456
SEKTION wall cabinet frame
white
36×14 3/4×15 “
1
60266049
BODBYN drawer front
gray
36×15 “
1
40279477
UTRUSTA large hinge for horizontal door
white
1
20295727
OMLOPP LED countertop light
white
18 “
2
12
90265449
SEKTION wall cabinet frame
white
36×14 3/4×30 “
1
80266034
BODBYN door
gray
18×30 “
2
40265526
UTRUSTA shelf
white
36×14 3/4 “
1
60204645
UTRUSTA hinge
125 °
2
20295727
OMLOPP LED countertop light
white
18 “
2
SUSPENSION RAILS
60261527
SEKTION suspension rail
galvanized
84 “
5
LEGS AND TOE KICKS
10265518
SEKTION leg
4 1/2 “
3
20267423
GREVSTA toekick
stainless steel color
87×4 1/2 “
1
00266052
BODBYN toekick
gray
84×4 1/2 “
3
COVER PANELS & FILLER PIECES
80266053
BODBYN cover panel
gray
25×30 “
1
KNOBS, HANDLES & DOOR DAMPERS
80230224
UTRUSTA push opener
1
40241823
UTRUSTA door damper for hinge
110-125 °
3
COUNTERTOP
80274864
EKBACKEN countertop
black stone effect
98×1 1/8 “
2
LIGHTING ACCESSORIES
80288328
ANSLUTA remote control
white
1
30121411
ANSLUTA power supply cord
11 ‘ 6 “
2
40119926
ANSLUTA intermediate connection cord
28 “
2
50288339
ANSLUTA electronic transformer
white
30 W
2
90320182
ANSLUTA electronic transformer
white
10 W
1
ADDITIONAL ARTICLES
20202083
FINTORP magnetic knife rack
black
15×1 ½ “
1

———————————————-